Easy elevator installation
From detailed planning to professional project manangement, we priortize construction elevator safety and maximize efficiency to keep your project on schedule and on budget, with no surprises.
Our self-climbing construction time elevator solution uses the building’s permanent elevator shaft during construction for smooth logistics that speed up building completion and lead to a quicker return on investment.
Accelerate construction with KONE JumpLift
KONE JumpLift provides early access to use the building's permanent elevator shaft for faster vertical transportation and increased load capacity, helping workers, their tools, and materials reach their destination floor faster, saving hours every day.
With a JumpLift construction elevator, workers spend less time traveling or waiting for materials to arrive, daily labor costs decrease, the building is finished faster, and owners can capitalize on their investment sooner.
KONE JumpLifts use the building's permanent elevator shaft for vertical transporation, so unlike traditional construction hoists and construction site lifts, work can proceed unhindered inside the building, regardless of external weather conditions.
Construction hoists can detach from the building to cause damage or injury, but a KONE JumpLift is installed inside the elevator hoistway to increase construction elevator safety and meet elevator safety regulations and codes.
Use the slider to calculate potential construction time savings for your mid rise buildings project now.
0 Days faster completion time*
* in a typical 12-24 month project, leveraging the potential of KONE JumpLift
Arriving at proiect completion earlier means tenants can be moved into building developments sooner